Tier 2 EUIt Calculator
Estimate the energy use intensity target (EUIt) for your covered building per WA CBPS §7.2.2 / §7.2.3, Tables 7-1, 7-2a, and 7-3.
Select each distinct activity occurring in the building, the gross floor area dedicated to it, and the weekly hours that activity is open to the public (per CBPS Table 7-3 footnote 4). For single-use buildings, enter one row.
| Building Activity Type | Gross Area (SF) |
Weekly Hours |
% of GFA |
Shift Factor |
Newly-Constructed Adjustment |
EUIt (kBtu/SF) |
Adjusted EUIt (kBtu/SF) |
|
|---|---|---|---|---|---|---|---|---|
| Building Total → | — | — | — |
How this calculator works
Step 1. For each building activity, look up the site EUI target (Table 7-2a) for your climate zone.
Step 2. Look up the operating-shifts normalization factor (Table 7-3) based on weekly hours: ≤50, 51–167, or 168 (24/7).
Step 3. Compute each activity's space-EUIt = EUIt × Shift Factor × % of GFA, then sum across activities to get the building-level area-weighted EUIt.
Step 4. If the building was permitted after July 1, 2016, the Newly-Constructed Adjustment applies — multiplying the target by 0.85 (i.e., tightening it 15%).